- Type Validation
- Time Hours
NCCER Inspection, Testing and Maintenance (18402)
Issued by
NCCER
Individuals can identify reasons for unsatisfactory sprinkler system performance. They know the importance of initial system testing and periodic inspections. They can describe general preparations for system repair and specific repair considerations for deluge systems and pre-action systems. They know how to prepare for inspection, maintenance and repair of special systems. They can explain the flushing process for underground piping, valve testing procedures and can perform a main drain test.
- Type Validation
- Time Hours
Skills
- Aboveground Pipe
- Deluge/Preaction Systems
- Dry Pipe Systems
- Flushing Underground Piping
- General Repair Preparations
- Initial System Testing
- Main Drain Test
- NFPA 25
- Overhead Pipe
- Periodic Inspections
- Report of Inspection
- Special Systems Preparations
- Underground Pipe
- Valve Testing Procedures
- Wet Pipe Systems