- Type Validation
- Time Hours
NCCER Power Line Worker: Distribution Level Two
Issued by
NCCER
Individuals understand the concepts of single- and three-phase alternating current. They can identify and describe equipment components found on overhead distribution system poles. They are familiar with underground residential distribution systems and overhead installations. They know how to install and remove conductors and cables used in overhead systems and URDs. They can perform inspection and maintenance procedures on poles, conductors, and equipment used in aerial and URD systems.
- Type Validation
- Time Hours
Skills
- Aerial Distribution Equipment
- Alternating Current
- Conductor Installation/Removal
- Distribution Line Maintenance
- Inspecting Aerial/URD Systems
- Locating Buried Cables
- Overhead Service Installations
- Splicing Conductors
- Street Light Connections
- Three-Phase Systems
- Transformer Operation
- Transformer Testing
- Types of Cable
- URD Service Installations
- URD Systems