NCCER Power Line Worker: Transmission
Issued by
NCCER
Individuals understand the development of single- and three-phase alternating current. They can explain transmission structure erection requirements and can describe applicable rigging equipment and practices. They can install transmission equipment and perform maintenance on transmission systems. They are able to replace existing conductors. They can complete live-line barehand tasks and are familiar with live-line hot stick equipment and procedures. They know how to implement a lift plan.
- Type Validation
- Time Hours
Skills
- Alternating Current
- Crane Stability Considerations
- Erecting Poles/Towers
- Grounding and Bonding
- Inspecting Transmission Systems
- Installing Transmission Equipment
- Lift Planning Considerations
- Live-Line Barehand Work
- Live-Line Equipment
- Reconductoring Transmission Lines
- Rigging Methods/Equipment
- Safety Practices/PPE
- Single- / Three-Phase AC
- Transmission System Maintenance
- Working with Helicopters