NCCER Power Line Worker: Transmission Level Two
Issued by
NCCER
Individuals understand the development of single- and three-phase alternating current. They are familiar with rigging practices and equipment specific to transmission structures. They can explain erection requirements for transmission structures, including grounding and bonding. Able to install insulators, conductors, and accessories, such as vibration dampers, spacers, lights, and markers. They can safely inspect and maintain transmission system insulators, conductors, towers, and poles.
- Type Validation
- Time Hours
Skills
- Alternating Current
- Crane Stability Considerations
- Environmental Concerns
- Grounding and Bonding
- Guying and Anchoring
- Inspecting Transmission Systems
- Installing Accessories
- Installing Conductors
- Installing Insulators
- Reactive Power
- Rigging Transmission Structures
- Right-of-Way Clearing
- Three-Phase Systems
- Transmission Structure Erection
- Transmission System Maintenance