- Type Learning
- Level Foundational
Introduction to Earned Value Management
Issued by
Pinnacle Management Systems, Inc.
This course introduces students to the processes, tools, and information required for effective project cost & schedule control using Earned Value Management (EVM). Students learn basic EVM terminology and formulas, and how to use to them to manage project performance. Students also learn about the work products associated with Organizing, Planning, Accounting, Analysis & Reporting, and Change Management as required for an EIA-748 compliant Earned Value Management System (EVMS).
- Type Learning
- Level Foundational
Skills
Earning Criteria
Standards
This is the standard for Earned Value Management used in DoD programs. The 32 guidelines listed in the EIA 748D standard provide a consistent basis to assist the Government and the contractor in implementing and maintaining acceptable EVM Systems.